When the transformer pressure relief valve YSF16-70*130KKJ is triggered by internal overpressure, correct reset operation is the key to ensure the continued safe operation of the equipment. This article will combine industry standards and field experience to explain the complete process and precautions of the reset operation.
I. Immediate response after action: safety confirmation and preliminary inspection
1. Cut off the power supply and hang a warning sign
Immediately disconnect the transformer power supply and hang an “equipment maintenance” warning sign in the operation area. At this time, please note:
- If the pressure relief valve has obvious oil spray marks, it is necessary to keep it still for at least 30 minutes to wait for the oil mist to settle
- Check whether there are unextinguished fire sources around, and use a carbon dioxide fire extinguisher to warn if necessary
2. Triple confirmation of the action status
- Mechanical signal pole: observe whether the yellow flagpole pops up. If it is not fully reset, the offset angle needs to be recorded
- Oil spray marks: measure the splash radius. If it exceeds 1.5 meters, the insulating oil pollution range needs to be evaluated
- Micro switch status: use a multimeter to check whether the normally open contact is closed
II. Core reset operation: mechanical and electrical synchronous processing
(I) Mechanical reset operation specifications
1. Reset rod operation skills
- Wear oil-proof gloves and push the reset rod inward steadily
- After hearing the “click” sound, keep the thrust for 3 seconds to ensure that the spring is fully returned
- Check the valve disc sealing surface: wipe it with a white cloth and observe whether there is any residual oil stains
2. Special working condition processing
- Low temperature environment (<-10℃): The valve body must be heated to above 5℃ before resetting
- Repeated action record: If the action exceeds 2 times within half a year, the maintenance cycle must be shortened to 3 months
(II) Key points for electrical signal reset
1. Junction box inspection process
- Mark the cable position before removing the junction box
- Test the relay contact resistance: the normal value should be ≤0.1Ω
- Adjust the iron sheet spacing: maintain a gap of 0.5-1mm to ensure flexible action
2. Signal verification method
- Short-circuit the test terminal to simulate the action and observe whether the DCS system alarm is released
- Use an insulation resistance meter to measure the insulation of the secondary circuit: ≥10MΩ is required
III. Key tests after reset: Eight must-check items
1. Sealing performance test
- Apply 1.2 times the set pressure (about 84kPa), maintain pressure for 30 minutes, and the leakage volume is ≤5mL
- Use a helium mass spectrometer leak detector for detection, and the sensitivity must reach 1×10−6Pa\cdotpm3/s
2. Mechanical property verification
- Action pressure deviation: Repeat the test three times, fluctuation range ≤±5%
- Reset pressure value: should be 10-15kPa lower than the action pressure
3. System linkage test
- Simulate overpressure triggering to verify that the protection system response time is ≤200ms
- Check oil chromatography analysis data: acetylene content should be <0.1μL/L
By strictly implementing the above reset operation process, the reliability of the YSF16-70*130KKJ pressure relief valve can be improved to 99.9%. Remember: every standardized operation is a solemn commitment to the safe operation of the power system!
When looking for high-quality, reliable pressure relief valves, YOYIK is undoubtedly a choice worth considering. The company specializes in providing a variety of power equipment including steam turbine accessories, and has won wide acclaim for its high-quality products and services. For more information or inquiries, please contact the customer service below:
E-mail: sales@yoyik.com
Tel: +86-838-2226655
Whatsapp: +86-13618105229
Yoyik offers various types of spare parts for steam turbines, generators, boilers in power plants:
Instrument valve J21H-P55110P
Check valve H61Y-1500SPL
Electric stop valve J961Y-P54.540V
Pneumatic Gate Valve Z661Y-100V
Stop valve J65Y-P55.519V
Safety valve A48Y-160
VALVE POPPET IK525
Three-way valve J21H-64
Stop valve J61Y-64P
Vacuum stop valve DKJ41H-10C
Servo Valves PSSV-890-DF0056A
Natural Gas Station, water makeup solenoid valve BZQDF-1
Check valve H61H-300SPL
Electric stop valve J961Y-P55.5140V ZG15Cr1MoV
Stop valve J61Y-P51110V
Stop valve J941H-25
Ripple sealed globe valve WJ40F1.6P-II
Stop valve J41Y-25
hydraulic accumulator for sale NXQAB 80/10-L
Electric stop valve J961Y-100I
Pneumatic control valve T667H-600LB
Hot re-export plug valve SD61H-P5538V
Solenoid Valve 4WE6D-L6X/EW220NZ5L
Globe valve WJ100F1.6P
Throttle valve L61Y-P5650P
Stop valve J41H-63
Hydrogen shut-off valve WJ61W-16P
Post time: Feb-18-2025